{"id":113,"date":"2017-01-18T11:01:32","date_gmt":"2017-01-18T08:01:32","guid":{"rendered":"https:\/\/mcgmuhendislik.com.tr\/?page_id=113"},"modified":"2020-05-15T13:15:23","modified_gmt":"2020-05-15T10:15:23","slug":"referanslar","status":"publish","type":"page","link":"https:\/\/mcgmuhendislik.com.tr\/en\/referanslar\/","title":{"rendered":"REFERANSLAR"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-padding-top:20px;--awb-padding-bottom:20px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last\" style=\"--awb-bg-size:cover;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\"><div class=\"fusion-text fusion-text-1\"><table style=\"width: 1066px;\">\n<tbody>\n<tr>\n<td style=\"width: 1070px;\">\n<h3><span style=\"color: #000000; font-family: 'arial black', sans-serif; font-size: 12pt;\"><strong>REFERANSLARIMIZ<\/strong><\/span><\/h3>\n<ul>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Istanbul (TR) for the contractor Lidya: new Kadikoy outfall \u2013 steel, 2235\u00d731,8mm, with 205mm ballast coating: design of the profile and of the launching ramp and installation procedures; assistance in the erection of the ramp and supervision for preparation of the launching facilities; assistance during the launching<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Sug\u00f6z\u00fc (Iskenderun, TR) for Gama-Tekfen JV (TR): Revision of the base design prepared by Siemens of the intake and discharge sealines for the Thermal Power Plant cooling system; evaluation, design and specifications for GRP (FW continuous mandrel type) 4 x DN2800, 415 m long + 4 x DN2400, 1280 m long; assistance in the qualification of the supplier and control and testing of the pipes; study of the pipeline and coastal scour protection; design of the intake structures and of the flexible connection to the pipelines; various intervention in assistance to the main contractor\u2019s team in the pipeline installation phase<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Guzelbahce (TR) for Sistem Yapi (TR) revision of the tender design and construction design of the HDPE, 630mm, 600m long outfall<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Fo\u00e7a (TR) for TCT (TR): assistance in the control of the design of the WWTP and outfall for the part related to the outfall design and installation procedures<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">[no location] for Maccaferri (I) \u2013 cooperation in the design and installation procedures for marine pipeline stabilization and protection elements (gabions, bag gabions and Sarmac bituminous mattresses); study of underwater barriers for scour protection; study of special applications on land pipelines<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">[no location] for SUBOR (TR) \u2013 general specifications for marine installation of GRP FW pipes<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Saida (Lebanon) for STFA (TR) \u2013 design for construction of a GRP outfall, 900mm diameter, 2200m long in Saida, Lebanon<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Zonguldak (TR) for Entes (TR) \u2013 tender design of the Zonguldak outfall (HDPE, OD 800m, 650m long in 50m depth)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Constanta (Romania) for STFA (TR) \u2013 tender design for the Constanta Nort and Eforie marine outfalls \u2013 HDPE, 1500mm, 2700m long + HDPE, 700mm, 1250m long, with study of the GRP alternative<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Antalya (TR) for DLH (TR): study of the replacement of the damaged coastal protection with a new shore protection structure realized with marine gabions and mattresses<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Cannakale (TR): assistance to one of the tenderers in the preliminary tender preparation for the Marmara Sea underwater crossing with a 36\u201d, 17 km long gas pipeline, max. depth ~ 80m, lay barge installation<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Biga (TR) for I\u00e7das (TR): revision and implementation of the design of the new intake structure and of the GRP ND 2200 pipeline for the cooling water system of a steel pipe factory (contractor Detek)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Turkey for Tekfen (TR): pre-feasibility study and basic evaluation of the potential marine teminals (Samsun, Black Sea and Ceyhan, Mediterranean Sea) at service of the planned SSC pipeline system<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Mersin (TR) for Alkyon (NL) on behalf of Detek (TR): coordination of the bathymetric and environmental survey for the Mersin Outfall<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Princess Islands (Istanbul, TR) for Detek (TR): construction design and assistance\/supervision for the IGDAS Adalar underwater gas pipeline project consisting in 3850m, 8\u201d steel pipe \u2013 from mainland to Buyukada and 3 sections for 4850m , 6\u201d steel pipe for the secundary island crossings, all installed with bottom pull.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Mersin (TR) for Sistem Yapi (TR): Tender design of the Mersin outfall (GRP, ND 1800, 2000 m long)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Cesme (TR) for Alcesu (TR\/FR): survey, video inspection and evaluation of the status and of the remedial interventions on the Alacati Outfall, GRP, ND 900<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Yarimca (TR) for Boz Group (TR): assistance in the evaluation of the tender documents and of the marine contractual conditions for the harbour construction tender<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Gemlik (TR) for Sina (TR): Revision of the design \u201cfor construction\u201d for the Gemlik outfall (HDPE, OD 630mm, 1,7km long to -42m depth<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Mersin (TR) for Sistem Yapi (TR): Design for approval from the Ministry of Environment, design for construction and supervision of Mersin outfall, GRP ND 1800, L=2100 m including 100m land section and 200m long tapered shallow water diffuser ND 1500\/1100\/800.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Libya for Metear (Turkey): Verification of the installation procedures for two intake projects for desalination plants in Libya (2 HDPE OD1400 L=950m and 2 HDPE OD1400 L=450m)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Kumkoy (Cyprus GR) for Arbiogas\/BEFESA (TR\/ES): tender design of marine facilities for the desalination plant (GRP intake ND1000 length 3300m + discharge ND 800 length 3700m + intake structures offshore)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Bandirma (TR) for A-TEC (Austria): Analysis of the contractor\u2019s design of a twin GRP ND 2200 intake pipeline and related offshore intake structures, and of the ND 2400 GRP discharge line and diffuser for the cooling water circuit of a CCPP in Turkey<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Alia\u011fa (TR) for Izdemir (TR): preliminary evaluations on the installation of a GRP ND 3000 intake line<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Samsun (TR) for Sistem Yapi (TR): tender design of the outfall HDPE \u00d8 1600 L 2500m<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Biga (TR) for I\u00e7das (TR) Design and preparation of Ministry permission documents + construction design for the discharge line for the new 2\u00d7600 MW Power plant, GRP ND 3500mm, 450m long<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Al Khalij (Libya) for GAMA (TR): \u2013 Independent Third Party GRP Pipe Inspector\/Consultant for the cooling water GRP onshore pipeline system (ongoing)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Wilhelmhafen (D) for Superlit (TR): support engineering for the supply and installation of GRP ND 3400 pipes for the intake and discharge lines of the cooling water system<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Hatay (TR) for Tekfen (TR): tender design for the offshore cooling water sealines (GRP 2 x 3000mm x 3450m + 2 x 2600mm x 2500m) and evaluation of alternatives El Ain El Sokhna (Egypt) for Besix-Orascom: Supervision of the production and delivery of GRP pipes 3 x ND 3000 and assessment of the installation methodologies for the intake and discharge sealines for the El Sokhna Power Plant (under way, January 2012)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Samsun (Turkey) for METKA\/Power Project (Greece): for the CCPP Power Plant, executive design of the intake and discharge sealines (GRP, 3 x ND 2400 + 2 x ND 3200); supervision of the pipe production and supervision of the installation (this last in course as per January 2012)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Project: Sochi Outfall (Russia) \u2013 Year: 2012 (restarted in 2013) -Location Sochi Adler \u2013 Client ARAS (TR) : Consultancy and design for the installation of the Sochi Outfall, HDPE structural pipe ND 2000 3700 m long (in cooperation with Increa, Spain):<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Further on design for the installation of the new pipeline, ND 2000 solid wall. 1413 m long to -25m depth, connected to 2000 m long tunne<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Baku (Azerbaijan): consultancy on the intake pipeline GRP ND 3200 for the Shimal II power plant and cooperation to the pipe producer in the design of an alternative offshore intake structure in GRP.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Turkmenistan: feasibility study for the installation ofa 10\u201d gal trunk line in Zhadanov B field (for Ilk\/Detek \u2013 Turkey) Aliaga (Turkey) for Izdemir \u2013 Peer review of the design of the intake (HDPE DN 1400) and discharge line (HDPE DN 900) and supervision of the excecutive design by the contractor and of the prefabrication and installation.<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Bursa (Turkey) survey, design and preparation of the Red Book for 2 outfalls (for IGIP) \u2013 started 2013<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Iskenderun (Turkey), supervision of the installation of the ND 4000 GRP, 700 m long discharge line of ATLAS Power Generation Inc. 2 X 600 MW, ISKENDERUN Coal-Fired Thermal Power Plant Turkey \u2013 for the pipe producer, Superlit<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Mostaganem (Algeria) for TML: Detail design and Method Statement for the installation of the 5 x 2500mm HDPE pipelines (under completion)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Salamina-Aegina submarine Aqueduct for Chr. D. Constantinidis S.A. Construction Company (Greece): executive engineering with the cooperation of Prof. Larsen for the installation of the 630mm HDPE pipeline in 90m depth<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Akkuyu Nuclear Power Plant for Yuksel Proje: consultancy services during preparation of the executive design (ongoing)<\/span><\/li>\n<li style=\"text-align: justify;\"><span style=\"font-family: arial, helvetica, sans-serif; font-size: 10pt; color: #000000;\">Akkuyu Nuclear Power Plant for Sebat Insaat: consultancy services during the installation of 10 x DN4000 GRP discharge lines (ongoing)<\/span><\/li>\n<\/ul>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"tags":[],"class_list":["post-113","page","type-page","status-publish","hentry"],"aioseo_notices":[],"_links":{"self":[{"href":"https:\/\/mcgmuhendislik.com.tr\/en\/wp-json\/wp\/v2\/pages\/113","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mcgmuhendislik.com.tr\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mcgmuhendislik.com.tr\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mcgmuhendislik.com.tr\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/mcgmuhendislik.com.tr\/en\/wp-json\/wp\/v2\/comments?post=113"}],"version-history":[{"count":0,"href":"https:\/\/mcgmuhendislik.com.tr\/en\/wp-json\/wp\/v2\/pages\/113\/revisions"}],"wp:attachment":[{"href":"https:\/\/mcgmuhendislik.com.tr\/en\/wp-json\/wp\/v2\/media?parent=113"}],"wp:term":[{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/mcgmuhendislik.com.tr\/en\/wp-json\/wp\/v2\/tags?post=113"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}